18142711R24-7/99Price - $3.00INSTALLATION,OPERATING AND SERVICEINSTRUCTIONS FORV7 SERIES OIL FIRED BOILERKNOCKDOWN & PACKAGEDHEATING UNITSThe ULC
10manner as rating label.c. On steam boilers, install the Lowest PermissibleWater Level Plate, Form No. 1204 (shipped inSteam Trim Carton), on the jac
11the sight glass using the two ½” tappings to theright of the probe LWCO.5. Install float-type Low Water Cutoff, if so equipped.See Figure below.a. I
12SECTION III: INSTALLATION INSTRUCTIONSA. REMOVE CRATE — (Packaged Boilers)1. Remove all fasteners at crate skid.2. Lift outside container and remov
13Fig 8: V73 Thru V79 Recommended Boiler Piping For Gravity Return Steam BoilerFig. 9: V72 thru V79, V713 and V714 Recommended Boiler Piping for Serie
14There are many possible causes of oxygen contamina-tion such as:1. Addition of excessive make-up water as a result ofsystem leaks.2. Absorption thro
15TABLE 3: TANKLESS HEATER DATA: RearMounted Heater on Steam and WaterBoilersTABLE 3A: TANKLESS HEATER DATA: FrontMounted Heater on Water BoilersWAR
16Fig. 14: Proper and Improper Locationsof Draft RegulatorFig. 13: Recommended Smokepipe Arrangementand Chimney Requirements3. For the same reasons a
17Lift "H"(See Fig. 16)Maximum Length of Tubing"H" + "R" (See Figure 16)3/8" ODTubing (3 GPH)1/2" ODTubing (3
18Fig. 18: Wiring Diagram for Steam Boilers with Optional McDonnell & Miller PS-801 Probe LWCO,Beckett AFG Burner and Controls, with or without Ta
19NOTE: The McDonnell Miller low water cut off incorporates a 10 second delay to prevent nuisance burner cut-off due to rapidwater level fluctuations
2IMPORTANT INFORMATION - PLEASE READ THIS PAGE CAREFULLY1. THIS BOILER HAS LIMITED WARRANTIES, COPIES OF WHICH ARE PRINTED ON THE BACK COVER OF THISMA
20Fig. 22: Wiring Diagram for Water Boilers with Beckett AFG Burner and Controls, with Tankless HeaterFig. 21: Wiring Diagram for Water Boilers with B
21SECTION IV: OPERATING AND SERVICE INSTRUCTIONSWARNINGAll boilers equipped with burner swing door have a potential hazard which can cause severe pro
22F. REMOVE GUN ASSEMBLY1. Items to be checked are nozzle size, type, andangle; head size (and setting on MD(V1)head); gunsetting; and positioning of
235. TURN “OFF” BURNER and remove pressuregauge. Install gauge port plug and tighten. Startburner again.6. CAD CELL LOCATION AND SERVICEThe burner is
24K. CHECK FOR CLEAN CUT OFF OF BURNER.1. AIR IN THE OIL LINE between fuel unit andnozzle will compress when burner is on and willexpand when burner s
25d. Dismount the low water cutoff control from theprobe.e. Unscrew the probe from the boiler tapping.f. Inspect that portion of the probe that is exp
26v. When boiler has cooled down sufficiently(crown sheet of sections are not too hot totouch), close the drain cocks at boiler and inreturn main and
27recommended boil out compound.iii. Replace safety relief valve.iv. Fill the entire system with water.v. Start firing the boiler.vi. Circulate the wa
2810. START-UP NOISE — Late ignition is the cause ofstart-up noises. If it occurs recheck for electrodesettings, flame shape, air or water in the fuel
29AQUASTAT SWITCHING ACTION WITHIN L8124CCONTROLThe switching action within the L8124C control hasthree settings:1. high limit2. low limit3. adjustabl
3TABLE OF CONTENTSI. General Information ... 3II. Knockdown Boiler Assembly ... 7III. Installation Instructions.
30WARNINGThe boiler must be connected to an approvedchimney in good condition. Serious property damagecould result if the boiler is connected to a dir
31SECTION VI: REPAIR PARTSAll V7 Series Repair Parts may be obtained through your local Burnham Wholesale distributor. Should you require assistance
32BARE BOILER ASSEMBLY
33ItemNo.Description Part No. V72 V713 V73 V714 V74 V75 V76 V77 V78 V79BARE BOILER ASSEMBLY (See Page 32 for Illustration)1Front Section (Non-Htr.), M
34BARE BOILER ASSEMBLY (CONTINUED)
35CONTINUED FROM PAGE 33ItemNo.Description Part No. V72 V713 V73 V714 V74 V75 V76 V77 V78 V79BARE BOILER ASSEMBLY (See Page 34 for Illustration)10Flue
36TS-39-112-DV713 and V714 FLUSH JACKET
37Item No. Description Part No. V713 V714V713 and V714 Flush Jacket Components - Items 1 thru 6 Include Insulation As Part of Assembly1 Jacket Front P
38V72 Thru V79 FLUSH JACKETTS-39-109-D
39ItemNo.Description Part No. V72 V73 V74 V75 V76 V77 V78 V79V72 Thru V79 Flush Jacket Components - Items 1 thru 7 Include Insulation As Part of Ass&a
4Figure 1B: V73 thru V79 Water Boiler with Tankless Heater (WBT)Figure 1C: V73 thru V79 Steam Boiler with or without Tankless Heater ("SBT"
40V73 Thru V79 STEAM BOILERS - TRIM AND CONTROLS
41ItemNo.Description Part No. V73 V74 V75 V76 V77 V78 V79V73 Thru V79 STEAM BOILERS - TRIM AND CONTROLS (See Page 40 for Illustration)1. Draft Regula
42V72 Thru V79, V713 and V714 WATER BOILERS - TRIM AND CONTROLS
43ITEMNO.DESCRIPTION Part No. V72 V713 V73 V714 V74 V75 V76 V77 V78 V79V72 Thru V79, V713 and V714 WATER BOILERS - TRIM AND CONTROLS (See Page 42 for
44Beckett AFG Burner
45BECKETT OIL BURNER PART NOS. FOR V7 SERIES BOILERSNOTE: When ordering parts always give the serial and model numbers shown on the boiler and burner
46Print word document
47
5Figure 1E: V713 and V714 Packaged Water Boiler with Tankless Heater (WBT)Figure 1D: V713 and V714 Packaged Water Boiler Less Tankless Heater (WB)Βυ
6TABLE 2: Minimum Installation Clearances ToCombustible Materials (Inches)A. INSPECT SHIPMENT carefully for any signs ofdamage.1. ALL EQUIPMENT is car
7SECTION II: KNOCKDOWN BOILER ASSEMBLYA. REMOVAL OF BARE BOILER FROM SKID1. Boiler is secured to base with 4 bolts, 2 on front and2 on rear, see Figu
8Figure 4: Boiler Tapping Locations and Usage (Knockdown Boilers Only)PURPOSE OF TAPPINGSTappingLocationSizeSteam Boiler Water BoilerNon-Heater w/Heat
9Figure 5: Knockdown Boiler Jacket Assemblyb. Tapping “M” —Install ¾” x 8” long nipple into¾” tapping located next to front section topsupply tappin