Burnham V8 Series Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Fervedor de água Burnham V8 Series. Burnham V8 Series User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 100
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
8
8142824R10.5-4/07
As an
ENERGY
STAR
®
Partner,
Burnham Hydronics
has determined that the
V83S, V83WM, V84S,
V84WM, V85S, V85WM,
V86S, V86WM and V87
meet the ENERGY STAR
®
guidelines for Energy
efciency established by the
United States Environmental
Protection Agency (EPA).
Price - $3.00
DNAGNITAREPO,NOITALLATSNI
ROFSNOITCURTSNIECIVRES
SEIRES8V
RELIOBDERIF-LIO
gnikeesnehW.reilppusliororotcartnocgnitaehruoyllac,reliobotsriaperroecivresroF
gnitaRnonwohssarebmuNlaireSdnarebmuNledoMrelioBedivorp,reliobnonoitamrofni
.reliobehtfopotnodetacollebaL
rebmuNledoMrelioB rebmuNlaireSrelioB etaDnoitallatsnI
____-____8V_ _______6
rotcartnoCgnitaeH rebmuNenohP
sserddA
Vista de página 0
1 2 3 4 5 6 ... 99 100

Resumo do Conteúdo

Página 1 - SEIRES8V

8 8142824R10.5-4/07As an ENERGY STAR® Partner, Burnham Hydronicsha

Página 2

10Figure 2: Minimum Installation Clearances To Combustible Materials (Inches)A. INSPECT SHIPMENT carefully for any signs of damage.1. All equipmen

Página 3

By this Warranty Statement the U.S. Boiler Co., Inc. of Lancaster,Pennsylvania i ssues limited warranties subject to the terms and conditionsstated

Página 4 - TABLE OF CONTENTS

11C. PROVIDE COMBUSTION AND VENTILATION AIR. Local and National Codes may apply and should be referenced.GNINRAWnoitalitnevdnanoitsubmocetauqed

Página 5

12SECTION II: KNOCKDOWN BOILER ASSEMBLYA. REMOVAL OF BARE BOILER FROM SKID1. Boiler is secured to skid with 4 bolts, 2 in front and 2 in re

Página 6

13Figure 5: Boiler Tapping Locations and Usage (Knockdown Boilers Only)SGNIPPATFOESOPRUPgnippaTnoitacoLeziSTPNrelioBmaetSrelioBretaWretaeH-noNretaeH/w

Página 7

14Figure 6: Knockdown Boiler Jacket AssemblyH. INSTALL TRIM. The following steam or water trim will be concealed or inaccessible after boiler jack

Página 8

156. Install jacket top panel. (See Figure 6, Item 2F). Place jacket top panel on boiler and secure to front, rear and left side panels with #8 x ½

Página 9

16ECITONekamroodgniwsrenrubgnirucesnehW.sedishtobnoyllauqeni-nwardsirooderusStep 3. Use a hand wrench to tighten door hardware and always start with

Página 10 - SECTION I: PRE-INSTALLATION

17 Disconnect the fl ared fi tting to the oil line and remove the aluminum thumb-nut from the nozzle line. Remove the combustion head assembly from

Página 11

18L. INSTALL CARLIN ELITE EZ OIL BURNER. (See Figure 7).Follow instructions in Paragraph J, Steps 1 through 6.7. Inspect oil nozzle, electrodes a

Página 12

19c. Initial Air Band Settingi. The nozzle size in GPH INPUT is printed directly on the air band. Loosen the locking screw, move the air band until

Página 13

2IMPORTANT INFORMATION - READ CAREFULLY The following terms are used throughout this manual to bring attention to the presence of hazards of vario

Página 14

20i. Remove the nozzle adapter (2) from the drawer assembly by loosening the screw (1).ii. Remove existing nozzle from nozzle adapter.iii. Insert t

Página 15

21 Riello manometers and vacuum gauges do not require any adapters, and can be safely connected to the pump ports. An NPT x metric adapter must be u

Página 16

22ECITONaniyrucremniatnocstimiLerusserPA404LoD.ebutdelaestonhsartehtnitimilecalp.efillufesustifodneehttasniatnoctahttimilagnicalpersitimilsihtfIod,ebu

Página 17

23b. Thread 1½” NPT x 15” long nipple into the 1½" NPT x 90° elbow and tighten with a pipe wrench.c. Thread one of the circulator fl ange onto t

Página 18

24Q. INSTALL TRIM AND CONTROLS WITH CARLIN ELITE EZ BURNER.Follow instructions in Paragraph N, Steps 1 through 7.Steam Boilers Only (see Figur

Página 19

251. Remove (2) #6 x 1/2" lg. machine screws and J-box cover from junction box.2. Secure 2" x 4" junction box to jacket front panel w

Página 20

26SECTION III: PACKAGED BOILER ASSEMBLYA. REMOVE CRATE.1. Remove all fasteners at crate skid.2. Lift outside container and remove all other in

Página 21

27Figure 11B: Top View - Burner Swing Door Mounted to Cast Iron Block Assembly (Jacket Removed for Clarity)

Página 22

28Step 4. From this position the door can be swung clear of the vertical circulator return piping to provide full access to the combustion chamber an

Página 23

29E. INSPECT COMBUSTION CHAMBER TARGET WALL AND LINER, AND SWING DOOR GASKET.1. Open burner swing door using procedure previously outlined

Página 24

3REGNADrosihtfoytinicivehtnisdiuqilrosropavelbammalfrehtoroenilosagesuroerotsTONOD.ecnailpparehtoynaGNINRAWytreporpesuacnacecnanetniamroecivres,noitar

Página 25

30 If the lower (minimum) input is desired, remove the nozzle which was factory installed. Locate the lower (minimum) fi ring rate nozzle that is sup

Página 26

31 A. EVALUATE THE EXISTING WATER SYSTEM. Design a piping system and install boiler which will prevent oxygen contamination of boiler water and

Página 27

32Figure 12: Recommended Piping for Combination Heating and Cooling (Refrigeration) System To perform a long term pressure test including the boiler

Página 28

33Figure 13A: Recommended Water Piping for Circulator Zoned Heating System

Página 29

34Figure 13B: Recommended Water Piping for Zone Valve Zoned Heating System - Supply Side Circulator

Página 30

35Figure 13C: Recommended Water Piping for Zone Valve Zoned Heating System - Return Side Circulator

Página 31

36SECTION V: STEAM BOILER PIPING AND TRIMA. EVALUATE THE EXISTING STEAM SYSTEM. The single most important factor in determining the expect

Página 32

37Figure 14: V83 Thru V89 Recommended Boiler Piping For Gravity Return Steam BoilerECITONenilretaw,esionmetsysevissecxenitluseryamlaunamsihtnideificep

Página 33

38SECTION VI: TANKLESS AND INDIRECT WATER HEATER PIPINGA. CONNECT TANKLESS HEATER PIPING as shown in Figure 15A. See Tables 2A and 2B f

Página 34

39Figure 15A: Schematic Tankless Heater PipingTABLE 2A: TANKLESS HEATER DATA: Rear Mounted Heater on Steam and Water BoilersTABLE 2B: TANKLESS HEATE

Página 35

4GNINRAWepipynawercsnutonoD.erusserphgihrednuretawtohyrevsniatnocreliobsihTylevitisoptuohtiwreliobsihtfostnenopmocynatcennocsidottpmettaronsgnittifdna

Página 36

40Figure 15B: Alliance™ Water Heater Piping with V8 BoilerB. CONNECT ALLIANCE™ INDIRECT WATER HEATER PIPING as shown in Figure 15B.1. Refer to

Página 37

41A. GENERAL VENTING GUIDELINES 1. Vent system installation must be in accordance with these instructions and applicable provisions of local build

Página 38

42Figure 17: Proper and Improper Locations of Draft RegulatorFigure 16: Recommended Vent Pipe Arrangement and Chimney Requirements

Página 39

43Figure 18: Optional Air Intake Piping Installation - Only Available with Beckett Burner2. After determining location, cut a hole in the wall to ac

Página 40

44A. GENERAL1. Install wiring and electrically ground boiler in accordance with requirements of the authority having jurisdiction, or in absence of

Página 41

45Figure 19: Wiring Diagram, Steam, Hydrolevel CG450 Probe LWCO for Beckett Burners BOILER SEQUENCE OF OPERATION WITH PROBE LWCOWhe

Página 42

46Figure 19A: Wiring Diagram, Steam, Hydrolevel CG450 Probe LWCO for Carlin Burners

Página 43

47Figure 19B: Wiring Diagram, Steam, Hydrolevel CG450 Probe LWCO for Riello Burners

Página 44 - SECTION VIII: ELECTRICAL

48Figure 20: Wiring Diagram, Steam, McDonnell & Miller PS-801 Probe LWCO for Beckett BurnersBOILER SEQUENCE OF OPERATION WITH PROBE LWCOWhe

Página 45

49Figure 20A: Wiring Diagram, Steam, McDonnell & Miller PS-801 Probe LWCO for Carlin Burners

Página 46

5TABLE 1A: DIMENSIONAL DATA (SEE FIGURES 1A THRU 1D)TABLE 1B: RATING DATABoiler Boiler Model No.Model No.Dimensions Dimensions See Figures 1A - 1DS

Página 47

50Figure 20B: Wiring Diagram, Steam, McDonnell & Miller PS-801 Probe LWCO for Riello Burners

Página 48

51Figure 21: Wiring Diagram, Steam, McDonnell & Miller 67 Float LWCO for Beckett BurnersBOILER SEQUENCE OF OPERATION WITH FLOAT LWCOWhen th

Página 49

52Figure 21A: Wiring Diagram, Steam, McDonnell & Miller 67 Float LWCO for Carlin Burners

Página 50

53Figure 21B: Wiring Diagram, Steam, McDonnell & Miller 67 Float LWCO for Riello Burners

Página 51

54Figure 22: Wiring Diagram, Water without Tankless Heater for Beckett BurnersBOILER SEQUENCE OF OPERATIONA call for heat by the thermostat energi

Página 52

55Figure 22A: Wiring Diagram, Water without Tankless Heater for Carlin Burners

Página 53

56Figure 22B: Wiring Diagram, Water without Tankless Heater for Riello Burners

Página 54

57Figure 23A: Wiring Diagram, Water with Front Tankless Heater for Beckett BurnersBOILER SEQUENCE OF OPERATIONA call for heat by the thermostat en

Página 55

58Figure 23B: Wiring Diagram, Water with Front Tankless Heater for Carlin Burners

Página 56

59Figure 23C: Wiring Diagram, Water with Front Tankless Heater for Riello Burners

Página 57

6Figure 1A: V82 thru V89 Water Boiler without Tankless Heater

Página 58

60BOILER SEQUENCE OF OPERATIONA call for heat by the thermostat energizes the L8124C control which in turn energizes the primary control to turn on

Página 59

61Figure 23D: Wiring Diagram, Water with Rear Tankless Heater for Carlin BurnersFigure 23E: Wiring Diagram, Water with Rear Tankless Heater for Carl

Página 60

62Figure 23F: Wiring Diagram, Water with Rear Tankless Heater for Riello Burners

Página 61

63Figure 24: Single Pipe Oil LineSECTION IX: OIL PIPINGA. GENERAL1. Use fl exible oil line(s) so the burner swing door can be opened without dis

Página 62

64TABLE 3: TWO-STAGE UNITS (3450 RPM) - TWO PIPE SYSTEMSTABLE 4: SINGLE-STAGE UNITS (3450 RPM) - TWO PIPE SYST

Página 63 - SECTION IX: OIL PIPING

65SECTION X: SYSTEM START-UPe. Open purge valve.f. Open shut-off valve in cold water supply piping located between the air scoop and expansion t

Página 64 - C. TWO PIPE OIL LINES

66Burners), hold for one (1) second and release to reset primary control.3. On STEAM BOILERS:a. With an L404A1354 - set cut-out pressure (MAIN sca

Página 65

67b. Locate oil pressure adjusting screw and turn screw to obtain proper pump pressure, refer to Table 6 at rear of manual.c. To check the cutoff pr

Página 66

68Figure 27A: "L1" and "V1" Head Electrode Positioning and Gun Setting (Beckett AFG)Figure 27B: "L1" and "V1"

Página 67

69 Carlin Elite EZ Burnersa. Carlin EZ-1HP and EZ-2HP burners use a head positioning bar to fi x the head setting based on nozzle size. To adjust th

Página 68

7Figure 1B: V83 thru V89 Water Boiler with Front Tankless Heater

Página 69

70sehsalFsmhoniecnatsiseRlleCdaC1004nahtsseL2008nahtsseldna004nahteroM30061nahtsseldna008nahteroM40005nahtsseldna0061nahteroMFigure 29: Cad Cell Loca

Página 70 - 2008nahtsseldna004nahteroM

71 • Perform cad cell resistance check as outlined in control feature. If resistance is below 1600 OHMS and burner runs beyond safety cut-

Página 71

72AQUASTAT SWITCHING ACTION WITHIN L8148A CONTROLS The switching action in the L8148A control has one set-ting, the high limit. The switching rel

Página 72

73Warning: This product contains refractory ceramic fi bers (RCF). RCF has been classifi ed as a possible human carcinogen. After this product is fi r

Página 73

74SECTION XI: MAINTENANCE AND SERVICE INSTRUCTIONSA. MAINTENANCE OF LOW WATER CUT-OFF DEVICESGNINRAWffo-tucretawwolepyttaolfdnaeborPdnanoi

Página 74

75 Operate the boiler with steam in the entire system for a few days allowing the condensate to return to the boiler. If the condensate can temporari

Página 75

76testing with hydrion paper which is used in the same manner as litmus paper, except it gives specifi c readings. A color chart on the side of the sma

Página 76

771. Spray inside surfaces with light lubricating or crankcase oil using gun with extended stem so as to reach all corners.2. With steam boilers, at

Página 77

78SECTION XII: BOILER CLEANINGA. CLEAN THE FLUEWAYS (See Figure 30).1. Prior to cleaning boiler, lay a protective cloth or plastic over combusti

Página 78

79Figure 30: Cleaning of Boiler FluewaysGNINRAWytreporpsuoireS.noitidnocdoogniyenmihcdevorppanaotdetcennocebtsumreliobehTforoiretniehT.yenmihcetauqeda

Página 79

8Figure 1C: V83 thru V89 Water Boiler with Rear Tankless Heater

Página 80

80A. COMBUSTION1. NOZZLES — Although the nozzle is a relatively inexpensive device, its function is critical to the successful operation of the oil b

Página 81 - SECTION XIV: REPAIR PARTS

81SECTION XIV: REPAIR PARTSAll V8 Series Boiler Repair Parts may be obtained through your local Burnham Wholesale distributor. Should you require

Página 83 - YLBMESSARELIOBERAB.1

83metI.oNnoitpircseD.oNtraP28V38V48V58V68V78V88V98VYLBMESSARELIOBERAB.1A1retaWdenihcaM,).rtH-noN(noitceStnorF---)RO(---maetSdenihcaM,).rtH-noN(noitceS

Página 84

84Bare Boiler Assembly (Continued)

Página 85

85metI.oNnoitpircseD.oNtraP28V38V48V58V68V78V88V98VYLBMESSARELIOBERAB.1 )deunitnoC(P1"8/3-3x"4/3-81x"2/1,teknalBrebmahCnoitsubmoC520820

Página 87

87metI.oNnoitpircseD.oNtraP28V38V48V58V68V78V88V98V.2YLBMESSATEKCAJ )s(lenaPtekcaJhtiwdedulcninoitalusnI-A2tekcarBtroppuSraeRtekcaJ1082407 11111111B2y

Página 88

88V83 Thru V89 Steam Boilers - Trim and Controls

Página 89

89metI.oNnoitpircseD.oNtraP38V48V58V68V78V88V98VSLORTNOCDNAMIRT-SRELIOBMAETS98VurhT38V.3A3rotalugeRtfarD"68826118 1111 ---------rotalugeRtfarD&qu

Página 90

9Figure 1D: V83 thru V89 Steam Boiler with or without Tankless Heater

Página 91

90V82 Thru V89 Water Boilers - Trim and Controls

Página 92 - Beckett AFG Burner

91METI.ONNOITPIRCSED.oNtraP28V38V48V58V68V78V88V98VSLORTNOCDNAMIRT-SRELIOBRETAW98VurhT28V.4A46" rotalugeRtfarD8826118 11111 ------------7" r

Página 94

93BECKETT OIL BURNER PART NOS. FOR V8 SERIES BOILERSNOTE: When ordering parts always give the serial and model numbers shown on the boiler and burner

Página 95

94ledoMrelioB68V78V88V98VnoitanibmoCebuTriANQADM07GFANQADM07GFANQADM07GFANQADM07GFA.oNcepSs'ttekceB1337BCB2337BCB3337BCB4337BCBdnaBriA29432943294

Página 96

95CARLIN OIL BURNER PART NUMBERS FOR V8 SERIES BOILERS NOTE: When ordering parts always give the serial and model numbers shown on the bo

Página 97 - XV. LOW WATER CUT OFF (LWCO)

96Table 6: BURNER SPECIFICATIONSrelioBledoMgniriFetaRHPGGFAttekceBnilraColleiRsgnitteS2elzzoN3pmuPerusserPrenruBledoMsgnitteS2elzzoN3pmuPerusserPrenr

Página 98 - SERVICE RECORD

97XV. LOW WATER CUT OFF (LWCO)GNINRAW.)OCWL(ffOtuCretaWwoLtekramretfanallatsniotseriwyrotcaftucotTPMETTATONOD.ffOtuCretaWwoLrofdeifitnediyllacificeps

Página 99

98SERVICE RECORDDATE SERVICE PERFORMED

Página 100 - Limited Warranty

99water boiler for its intended purposes and its maintenanceaccordance with U. S. Boiler Co., Inc. recommendations andhydronics industry standards. Th

Comentários a estes Manuais

Sem comentários